Especially as I have to start travelling now between the UK and France.
Also I managed to get my little finger between the 4lb lump hammer and the iron bound "persuader" I was using to force the pine tongue and groove flooring, so I'm sort of walking wounded and my work output has dropped a bit. Workaway will help a lot.
I'm doing about a meter of flooring a morning right now before I go to work. It should all be done (for the wood we have), by end of Saturday. Lot of other work still to do, doors, speakers, up on the roof and fit the new 8 way lnb then put ends on the 8 cables. Fit the new TV arriving on Thursday to the new wall bracket which has already arrived, wire the two network cables back into my room and finish the wiring for the two reclining seats which are sitting there covered to protect them.
I forgot, once Mrs S paints the cast iron radiator, fit it and plumb it into the central heating.