Oh heck Saundra, that doesn't sound good
Thankfully it looks like he's not going. The site manager called him this morning to say that there was a big problem with a design drawing that John's dept had done so that was why he was on stand by to go. I told him not to worry, they're always being told that and it always turns out to be that the fitters on site have made a mistake, not a problem with the design drawing whatsoever. And that was exactly what had happened yet again, something had been fitted together wrong. Again.